RM Bridge CONNECT Edition V11 Update 7 (V11.07.00.12) includes the following enhancements and error corrections:
- Reinforcement Design -Phase I
- New Takeda Hysteretic Spring Element
- New Action (SupCoex) for Reporting Concomitant Envelope Results in Different Element
- Optimization for Live Load Analysis
- TrackSup Action for Displacement Results
- Enhancements in GUI
- Distributed uniform loads for FEM
- Error Corrections
For the detailed release notes, please see the attached PDF file.